The Engine-Scheduler Interface used in the Muse OR-parallel Prolog System

Citation:

Anon. The Engine-Scheduler Interface used in the Muse OR-parallel Prolog System. 1995.

Abstract:

This paper contains a definition and description of the required macros, emphasizing information needed by the Prolog engine programmer. Contents